The recent closure was shorter than planned and there was less disruption than anticipated. The Parish Council liaised closely with DCC Highways to ensure appropriate signage was in place to minimise disruption to Hope and Aston residents. We invite feedback from residents on their experience of the October closure so we can influence how closures and signage are used if and when longer-term, more substantial work at the bridge is undertaken.